Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 亚洲无碼网站观看| 精品乱子伦一区二区三区高| 精品日韩妖精视频在线观看免费| 国产视频第二页| 国产成人无码一区二区三区在线专区被成人日本欧美欧美成 | 四虎影视永久无码精品| 乱伦久久国产亚洲| 国产人妖系| 成人午夜视频一区二区国语| 91久久国产青草亚洲| 亚洲精品日产AⅤ| 日本无码在线观看综合| 久久日本精品国产精品| 国产在线观看香蕉视频| 国产成人精品一区二区秒拍| 18禁超污无遮挡无码网址| 无码高潮又爽又黄A片| 欧美人妻一区二区三区| 精品日产1区2卡三卡| 国产a一级毛片爽爽影| 91久久综合精品国产丝袜长腿| 亚洲AV成人影视在线观看| 欧美日韩国产高清| 国产一区二区高清视频| 成人中文字幕在线高清| 2020久久精品国产免费| 日产中文乱码字幕无线观看| 久久久久久精品天堂无码中文字幕| 国产人妖系| 96精品视频| 思思久久99| 久久久久久无码大片a片| 国产婷婷综合在线视频| 成人h动漫精品一区二区无| 亚洲天堂三区| 免费久久精品| 国产乱理伦片在| 99日韩在线国产一级人爱| 三个老外与一女做爰A片| 久久国产人妻一区二区免费 | 国产精品jizzjizz|